St. Louis Children’s Hospital 6th Floor OR HVAC Pressurization

Following a decade of hospital expansions and renovations, the hospital determined that the air balance on the 6th Floor operating suite was not performing satisfactorily.  Pressure control was changing depending on factors outside the OR and were not predicable.  8760…
Read more >

BJC – WUMC Strategic Campus Plan for Utility Services

In 2012, the Washington University Medical Campus began a campus expansion plan that would transform a 25 city block medical community consisting of Barnes Jewish Hospital, the Washington University School of Medicine, St. Louis Children’s Hospital and the CORTEX District.…
Read more >

BJC – St. Louis Children’s Hospital HVAC Study

The 6th floor operating room suites at BJC St. Louis Children’s Hospital had a history of HVAC and pressure differential problems. 8760 was hired to balance the 6th floor operating suites, reduce system airflows and solve the hospital-wide HVAC issues.…
Read more >

BJH – Alton Memorial Hospital Retro-Commissioning

Alton Memorial Hospital consists of six main structures connected together that make up the main hospital building. The gross area of the hospital is 454,000 sq. ft. 8760 Engineering was hired as the Retro-Commissioning service provider to identify no-cost/low-cost energy…
Read more >

WUSM – West Building Energy Study

In coordination with Washington University’s goal of reducing carbon emissions, 8760  recognized that the West Building, a 6-story, 106,000 sf building housing a mix of laboratories and offices, would benefit from an energy study. Studies performed on similar buildings on…
Read more >

WUSM Campus Energy Metering

Washington University is located on a 100-acre site in an urban area of St. Louis. In accordance with the University’s goal of achieving sustainability by the year 2020, they began a metering project, to be completed in phases throughout the…
Read more >