St. Louis Children’s Hospital 6th Floor OR HVAC Pressurization

Following a decade of hospital expansions and renovations, the hospital determined that the air balance on the 6th Floor operating suite was not performing satisfactorily.  Pressure control was changing depending on factors outside the OR and were not predicable.  8760…
Read more >

BJC – WUMC Strategic Campus Plan for Utility Services

In 2012, the Washington University Medical Campus began a campus expansion plan that would transform a 25 city block medical community consisting of Barnes Jewish Hospital, the Washington University School of Medicine, St. Louis Children’s Hospital and the CORTEX District.…
Read more >

BJC – St. Louis Children’s Hospital HVAC Study

The 6th floor operating room suites at BJC St. Louis Children’s Hospital had a history of HVAC and pressure differential problems. 8760 was hired to balance the 6th floor operating suites, reduce system airflows and solve the hospital-wide HVAC issues.…
Read more >

BJH – Alton Memorial Hospital Retro-Commissioning

Alton Memorial Hospital consists of six main structures connected together that make up the main hospital building. The gross area of the hospital is 454,000 sq. ft. 8760 Engineering was hired as the Retro-Commissioning service provider to identify no-cost/low-cost energy…
Read more >

UMSL – North Campus Energy Study

During spring of 2012, 8760 Engineering was hired by the University of Missouri – St. Louis to perform an Energy Master Plan for the North Campus.  This campus included 19 buildings with a combined gross area of 2.3M square feet.…
Read more >

Centre College – Residential Village

Centre College’s latest residence hall expansion included the Residential Village complex, consisting of includes a complex of 6 buildings housing 26 apartment style residences as well as a commons building for student gatherings. Constructed to a LEED Silver Rating, the…
Read more >

WUSM – West Building Energy Study

In coordination with Washington University’s goal of reducing carbon emissions, 8760  recognized that the West Building, a 6-story, 106,000 sf building housing a mix of laboratories and offices, would benefit from an energy study. Studies performed on similar buildings on…
Read more >

MS&T – Gale Bullman Multi-Purpose Building

This project was undertaken to evaluate options for renovating the central heating and cooling systems for the University Of Missouri Science & Technology Student Wellness Center.  The Wellness Center is a combination of the Gale Bullman Multi-Purpose Building and Recreation…
Read more >

JBU – Engineering and Construction Management Building

John Brown University embarked on this program to replace their 25,000 sf engineering and construction management building with a new 40,000 sf state of the art education and laboratory building. Constructed to a LEED Certified rating, the building incorporates energy…
Read more >

WUSM Campus Energy Metering

Washington University is located on a 100-acre site in an urban area of St. Louis. In accordance with the University’s goal of achieving sustainability by the year 2020, they began a metering project, to be completed in phases throughout the…
Read more >

BJC Christian Hospital RetroCx

BJC HealthCare was targeted for a retro-commissioning program to identify energy saving opportunities that would require little capital expenditure (less than 1.5 years payback). 8760 Engineering began their work with a complete facility assessment and determined energy efficiency measures (EEM’s)…
Read more >

University of Tulsa Central Plant Analysis

A rapidly growing campus led the University of Tulsa to evaluate the performance of the central chilled water and heating water plant. It had been many years since the general operation and capacity had been evaluated. 8760 Engineering was hired…
Read more >

University of Alabama, Birmingham Campus Energy Study

The University of Alabama School of Medicine resolved to pursue a campus energy usage reduction study. As part of the audit, we analyzed the following projects: HVAC conversion to VAV Airflow Reductions Temperature Setback Unoccupied Airflow Setbacks Heat Recovery Chillers…
Read more >

Southeast Missouri State University Boiler Plant Replacement

Central Steam Boiler Plant and Related Chiller Infrastructure Study Implementation of Conversion of Boiler Plant from Coal to Natural Gas Firing Replacement of Campus Absorption Chiller In 2010, 8760 Engineering was asked to study the central steam plant and to…
Read more >

John Brown University Engineering Arts Building

John Brown University embarked on this program to replace their 25,000 sf engineering and construction management building with a new 40,000 sf state of the art education and laboratory building. Constructed to a LEED Certified rating, the building incorporates energy…
Read more >

Indiana University, Bloomington Campus Energy Master Plan

Indiana University – Bloomington is a residential academic and research campus with more than 15,600,000 square feet of space serving more than 41,000 students and 7,500 faculty and staff.  In July of 2010, 8760 Engineering was hired to prepare an…
Read more >

City of Eureka, MO Recreation Center

In 2011, the city of Eureka (located in western St. Louis County, Missouri) embarked on the construction of a community recreation center designed to provide a multi-use gymnasium, cardio and strength fitness space, meeting / conference space, food preparation kitchen…
Read more >

Monsanto Utilities Weather Normalization

In 2012, Monsanto challenged 8760 Engineering with the task of developing software allowing them to track their current energy consumption and analyze their utilities in comparison to a base year for both of their major campuses in the St. Louis…